How to Perform Routine Maintenance on Ultrasonic Level Meters
Ultrasonic level meters routine maintenance guidelines:
1. Check whether the measured value is consistent with the actual value. Check whether the installation location has protective measures against sun and rain.
2. Check whether the technical requirements of the measurement point are met, such as process temperature, pressure, ambient temperature, measurement range, etc.
3. During daily use and maintenance of the ultrasonic level meter, visually inspect the instrument for any damage to components.
4. Check whether the heat tracing is functioning properly.
5. During operation, the power supply must match the data on the nameplate, and the power should be disconnected before wiring.
6. Check whether the terminal positions are correct, the cable sealing gland is tightened, and the housing cover is tightened. If there is an auxiliary power supply, check whether the display module is showing.
